HOME

SITE MAP

IRTSA

NEWSLETTER-VRE

DISCUSSION FORUM

GUEST BOOK

PENSIONERS

RAILWAYS

GOVERNMENT

SCPC

ADVERTISEMENTS

LEGAL FORUM

USEFUL LINKS

PHOTO GALLERY

IRTSA WEB MAIL

GOOGLE MAIL

YAHOO!

CONTACT US

 

QUESTION BANK FOR SELECTION TO GROUP "B"

MECHANICAL DEPARTMENT

 (DIESEL LOCO) - PART I


Instructions:
You just have to check the radio button against the answer which you think is correct, and in order to confirm, place mouse over the Button "Correct Answer". All the best! 

Q. I.  Flasher light modification in diesel loco is done for ?

  • Better illumination of flasher light

  • Modified flasher light

  • Safety in case of train parting

  • None of the above

  •  Q. II. When emergency brake application is done through A-9 in locos with flasher light modification, condition of Loco comes to ?

  • Loco comes to idle and nothing else happens

  • Loco comes to idle and flasher light is on

  • Loco comes to idle and flasher light is on & buzzer blows

  • Loco does not come to idle, flasher light is on & buzzer blows

  • Q. III. How many braking positions of A-9 valve?

  • 05 braking position

  • 04 braking position

  • 03 braking position

  • 01 braking position

  • Q. IV. Permissible blockage of vacuum train pipe in cm is ?

  • 0 cm

  • Up to 8 cm

  • Up to 12 cm

  • Up to 20 cm

  • Q. V. Duplex check valve operates when MR pressure reaches pressure (kg/cm2) ?

  • 5 kg/cm2

  • 6 kg/cm2

  • Always open

  • 10 kg/cm2

  • Q. VI. Twin pipe system in locos has what advantage ?

  • Better acceleration

  • Loco to bring to idle

  • Achieving less braking distance

  • Maintaining MR

  • Q. VII. When H-5 or HB-5 valve operates which air goes to PCS ?

  • MR Pressure

  • HS-4 Pressure

  • FP Pressure

  • BP Pressure

  • Q. VIII. When  big diaphragm of VA-1B control valve gets punctured, what action will happen ?

  • Vacuum will drop to zero

  • Vacuum will not drop down

  • Vacuum will drop partially

  • None

  • Q. IX. R-6 relay valve is fitted in loco for ?

  • Quick MR charging

  • Quick working of AFM valve

  • Quick vacuum building

  • By-passing AFMV

  • Q. X. The standard colour of humidity indicator in air dryer is ?

  • Orange

  • Purple

  • Blue

  • White

  • Q. XI. Purge value in air dryer is for ?

  • Maintaining supply of MR pressure

  • Removing moisture

  • Creating vacuum in air dryer

  • Charging air dryer

  • Q. XII. When 7.5 mm dia hole palm end is fitted, the change vin BP pressure is ?

  • Should remain same in one minute

  • Should fall below 4.0 kg/cm2 in one minute

  • Should not fall below 4.0 kg/cm2 in one minute

  • Should come down to 3 cm in one minute

  • Click here for Printer friendly version of

    Complete Question Bank for Mechanical Department in 4 Parts

     
     
     
     

    All Rights Reserved.

    Copyright © 2008 Indian Railways Technical Supervisors Association

    Central Hd. Qtrs.- 32 Phase 6, Mohali, Chandigarh-160055